Large Run Tube Filling — Without Tying Up Your Line
A 100,000+ tube run
A 100,000-tube run of a lower-margin product can commit a production line for days — and while it's committed, every higher-margin job, rush order and new launch in the plant queues behind it. Send that run to us instead. Our company fills tubes and nothing else. So here your big run isn't an interruption to the schedule. It is the schedule.
The hidden cost of a big run
Line time is the scarcest thing in a plant, and a large run spends it like nothing else. A 50,000, 100,000, 250,000, 500,000 or 1,000,000-unit run of a low-margin product eats a line for days, weeks or months. For all of that time, the profitable jobs wait. The run itself may be perfectly good business — it's everything it pushes off that costs you.
Running the big job in-house doesn't make that cost go away; it just makes it yours. And if your current filler runs your job on shared lines, the same thing happens from the other side: when something hotter comes into their plant, your big run is the one that gets pushed.
A company that only fills tubes
We Fill Tubes exists for one job. Our capacity is tube filling capacity — dedicated plastic machines and dedicated metal machines — so a large run here displaces nothing. There's no higher-margin work of ours competing for the line, and no other product category waiting on the same equipment. Your line at home stays on the work that makes its money, and your other jobs stop getting pushed.
That's the whole model, and it's the line on our door: Tube Filling. It's All We Do.
Our first job was 250,000 tubes
Large runs aren't a stretch goal for us — they're how this company started. In 2015, a contract manufacturer's tube filling machine broke mid-job against a hard deadline: 250,000 sugar scrub tubes for a subscription box order. We took the job on as an emergency and shipped it on time. That run took 9 people on the line; the same work runs with 2 operators today, thanks to automation. It's the story on our About page.
What a large run looks like here
The runs that clog a line are usually the runs that fit us best:
- Subscription box volumes with a ship date that doesn't move
- Seasonal and promotional runs that spike once or twice a year
- Retail launches that need real volume on day one
- A flagship product's big reorder — high volume, thinner margin, always in the way at home
Plastic (PE and PCR), laminate (ABL and PBL) and aluminum tubes, 16mm to 50mm, 0.25oz to 11oz fills, no tooling fees — under an ISO 9001 quality system integrated with ISO 22716 cosmetic cGMP, in an FDA-registered facility (MoCRA, with an FEI number as a Cosmetic OTC Repackaging Facility). We fill, seal and pack only — no formulation. You ship tubes, bulk and components to our Vernon, New Jersey facility, or have your suppliers ship direct, and finished goods ship back to you or onward to your warehouse or 3PL.
Scheduled runs, agreed up front
A large run is a scheduled run. Before it starts, we agree the timeline with you — based on the quantity, the tube type and when materials arrive — and that schedule is the commitment. Our standard turnaround of about a week applies to standard runs; a very large run gets its own timeline, set honestly up front rather than squeezed into a promise it can't keep. If what you need is overflow or backup capacity alongside your own filling, rather than one big scheduled run, our tube filling co-packer page covers that arrangement.
Frequently asked questions
How large a run can you take? Is there a maximum?
What does a large run need from us?
How is the timeline for a large run set?
Can you handle recurring or repeat large runs?
Do large runs work for both plastic and metal tubes?
Ready to get your tubes moving?
Send your tube size, quantity, product type and ideal timing. We’ll help you map the fastest route to production.